A Road closure is required for works to reinstate diverted utilities across the entire carriageway, these works cannot safely be carried out without a full closure of the carriageway. These have been planned during the night to minimize the disruption to the general public due to events being on during the day at the O2.

 

Dates:

Mon 15/01/24 – Fri 19/01/24 22:00 - 06:00 each night.

Road will open as per current layout during the day.  